Installation of the Raised Flooring

2019.12.02

FINECO raised floor installation is to be done with the company recommended procedure through authorized dealer and contractor. The floor should be solid, flat and free form dust& moisture. If possible, epoxy paint on the existing floor is recommended. Do water level marking and pedestal marking at site prior to installation to avoid overlapping of the services. Complete the cable tray, piping, insulation, and control panel MS stands activity before installing the access floor. Then lay the complete raised floor system including the tile, pedestal and stringer at one starch and place the cut pieces of the tile, fix the pedestal with adhesive or anchor fastener. Do the final leveling of the false floor jamming the total system from all sides. Remove the center full tiles for placing the cables and other services with panel lifter. Tiles can be cut at site for wire opening and grommet fixing.